Search  for anything...

100pcs 5mm RGB Tri-Color (Red Green Blue Multicolor) 4Pin LED Diodes Common Cathode Diffused Round Lens 29mm Long Lead +300pcs Resistors (for DC 6-12V) Included,Light Emitting Diodes

  • Based on 1,454 reviews
Condition: New
Checking for the best price...
$8.99 Why this price?
Save $119.26 was $128.25

Buy Now, Pay Later


As low as $2 / mo
  • – 4-month term
  • – No impact on credit to apply
  • – Instant approval decision
  • – Secure and straightforward checkout

Ready to go? Add this product to your cart and select a plan during checkout.

Payment plans are offered through our trusted finance partners Klarna, Affirm, Afterpay, Zip, Apple Pay, and Google Pay. No-credit-needed leasing options through Acima may also be available at checkout.

Learn more about financing & leasing here.

Selected Option

Free shipping on this product

FREE 30-day refund/replacement

To qualify for a full refund, items must be returned in their original, unused condition. If an item is returned in a used, damaged, or materially different state, you may be granted a partial refund.

To initiate a return, please visit our Returns Center.

View our full returns policy here.


Availability: In Stock.
Fulfilled by Amazon

Arrives Tuesday, Oct 20
Order within 23 hours and 33 minutes
Available payment plans shown during checkout

Protection Plan Protect Your Purchase
Checking for protection plans...

Style: 5mm Constant Light


Color: [25] Rgb Tri-color (Common Cathode) / 100pcs


Features

  • Product Overview: 100 pcs LED Diodes + 300 pcs Resistors
  • Product Features: Tri-Color (Red/Green/Blue) Lights / Common Cathode / 5mm Diffused Round Lens
  • Product Parameters: 29mm Long Lead / Red: DC 2.0-2.2V; Blue&Green: DC 3.0-3.2V (IF=20mA) / 0.06 Watts / 2pin / DIP LEDs
  • Product Parameters: Luminance Brighter Up To +20% / 120 Viewing Angle / Single LED Diodes Wight: 0.38g
  • Accessories: 200pcs 430ohm + 100pcs 470ohm (For DC 6-12V) 1/4 Watt Metal Film Resistors Included / 1% Tolerance

Description

Low Energy Consumption And Low Heat. Industrial Standard Size,29mm Long Lead for widely used and convenient for cperation. Soldering Condition (Manual Soldering):Less Than 3 Seconds With 482°F-527°F Soldering Condition (Reflow Soldering):Less Than 5 Seconds With 500°F Storage Conditions: Drying Preservation And Keep Away From Fire Or High Temperature. Get other LED models? Please search "EDGELEC Diodes".

Brand: EDGELEC


Light Type: LED


Special Feature: Instant On


Bulb Shape Size: G30


Bulb Base: E26


Brand: ‎EDGELEC


Light Type: ‎LED


Special Feature: ‎Instant On


Bulb Shape Size: ‎G30


Bulb Base: ‎E26


Specific Uses For Product: ‎General purpose


Light Color: ‎Multicolors


Voltage: ‎12 Volts


Unit Count: ‎100.0 Count


Number of Items: ‎1


Brightness: ‎6 lumen


Shape: ‎5mm Round Top


Material: ‎Polycarbonate (PC)


Indoor/Outdoor Usage: ‎Indoor


Power Source: ‎electrical


Beam Angle: ‎120 Degrees


Power Consumption: ‎4 Watts


Item Package Quantity: ‎100


Light Source Type: ‎LED


Item Weight: ‎380 Milligrams


Light Source Wattage: ‎0.06 Watts


Product Dimensions: ‎0.2"W x 1.4"H


Accepted voltage frequency: ‎100 to 240 Volts and 50 Hertz to 60 Hertz


Bulb Diameter: ‎0.2 Inches


Control Method: ‎Touch


White Brightness: ‎300 Lumens


Efficiency: ‎energy-efficient


Style: ‎5mm Constant Light


Manufacturer: ‎EDGELEC


Color: ‎[25] Rgb Tri-color (Common Cathode) / 100pcs


UPC: ‎611355168972


Light Output Maximum: ‎6 Lumens


Item model number: ‎ED_YW05_RGB-4P-C


Is Discontinued By Manufacturer: ‎No


Manufacturer Part Number: ‎ED_YW05_RGB-4P-C


Special Features: ‎Instant On


Date First Available: December 4, 2017


Frequently asked questions

If you place your order now, the estimated arrival date for this product is: Tuesday, Oct 20

Yes, absolutely! You may return this product for a full refund within 30 days of receiving it.

To initiate a return, please visit our Returns Center.

View our full returns policy here.

  • Klarna Financing
  • Affirm Pay in 4
  • Affirm Financing
  • Afterpay Financing
  • Zip Pay in 4
  • Financing through Apple Pay
  • Financing through Google Pay
Leasing options through Acima may also be available during checkout.

Learn more about financing & leasing here.

Top Amazon Reviews


  • Christmas Light (LED) Repair
Style: 5mm Constant Light Color: [01] 6 Color X 20pcs / 120pcs
Summary - Nice pack of LEDs to repair Christmas lights Pros - Common colors, good for Christmas lights - 20 of each color - Good price Cons - Base of light is wider than the light, so it doesn't sit down in the Christmas light base I used these to repair burned-out LEDs on several strands of C9 Christmas lights. I like the color choices, as they are common to most Christmas light strands. Mine are red, orange, yellow, green, and blue. This pack contains 20 of each of these colors along with 20 white and 2 packs of resistors which is a nice bonus feature (but not useful for repairing my Christmas lights). These function very well, my only minor complaint is that they do not sit snug down in the holder for the LED like the original ones. They do stay in place relatively well once you bend the wires around the base. Speaking of wires, they have a very long wires so once you bend them in place, you will need to snip off the excess. But... Make sure you don't snip off too much or the LED will not have proper contact and won't light (I found this out the hard way). These are very bright and the colors are true. I'll be buying them again. Overall I am very happy with this purchase. If this helped you, please consider giving it a thumbs up. Thank you. ... show more
Reviewed in the United States on December 3, 2018 by Big Orange Wookie Big Orange Wookie

  • Nice RGB LEDs
Style: 5mm Constant Light Color: [25] Rgb Tri-color (Common Cathode) / 10...
I only needed one for a project but ended up buying this as I can always find a use for an RGB LED... I have purchased other EDGELEC products and they have seemed to be well packaged and work. These are no exception. So far, not a single dud in the package! They are definitely brighter at higher voltages (as expected), seem to like 5vdc the best but include resistors to use at 12vdc should you need to do so. A bit dim at 3.3vdc but there are use cases for that type of brightness, YMMV. Great value and appear to be durable. I probably have a lifetime supply but if I ever need more, I know where to get them. ... show more
Reviewed in the United States on June 16, 2025 by R. Sattler

  • If you know what you are doing, they are great and effective.
Style: 3mm Constant Light Color: [17] Red&green (Common Cathode) / 10...
I used a solid 12-volt power for the base, ran the power to a bucker to kick it down to 2.2 volts, went through a DPDT pushbutton, installed one of the included resistors on the red leg (the longer of the two) then by pressing the button on the switch, quite readily flip back and forth between red and green. ... show more
Reviewed in the United States on November 5, 2025 by Gold Country

  • Good brightness uniform light output
Style: 5mm Constant Light Color: [17] Red&green (Common Cathode) / 10...
Very nice LED using as red H green L In logic circuits buffer drives Red inverter drives Green really makes data buss and address buss easier to read any other device output is much easier to understand. Blinking LED’s are the best.
Reviewed in the United States on November 4, 2025 by Collector

  • Nice diffused warm white, bright, good value
Style: 5mm Constant Light Color: [09] Warm White / 100pcs
I tested these up to 18 mA and they are bright enough to be uncomfortable for direct viewing. These have a nice diffused warm color to emulate incandescent lamps. I burned one out immediately at 29 mA so I recommend not going above 20 mA. ALWAYS use a current limiting resistor!
Reviewed in the United States on June 6, 2025 by Doktor Dreem

  • Works great
Style: 5mm Constant Light Color: [25] Rgb Tri-color (Common Cathode) / 10...
Great selection for the project i am working on.
Reviewed in the United States on November 9, 2025 by D. Krakowiecki

  • Think Carefully When Using 12 Volts
Style: 5mm Constant Light Color: [25] Rgb Tri-color (Common Cathode) / 10...
Favorable remarks: neatly packaged and a tested set of the components appeared to perform as specified. I tested with continuous current at 12 volts through each anode, using the supplied resistors: 470 Ohms for red and 430 Ohms for green and blue. The individual colors were very distinct. Then I energized all three colors simultaneously. The RGB LED then gave a very bright, cool-white light. Current consumption remained steadily near 60 milliAmps during test period of 2 hours. Conclusion: I would feel confident using the products supplied at voltages up to and including 12 volts. However, the resistors became very hot. The reason may be that they are rated for 1/4 Watt = 250 milliWatts. For comparison, 20 milliAmps x 12 Volts gives 240 milliWatts. The resistors are being pushed almost to the upper limit of their specification. It seems prudent to think about ways to increase the margin of safety. For continuous operation at 12 Volts and 20 mA I would consider replacing the supplied, 1/4-Watt resistors with more robust, 1/2-Watt parts. Other alternative approaches might include reducing the supply voltage or pulsing the 12-Volt current using PWM. ... show more
Reviewed in the United States on April 13, 2024 by David G. Sparks

  • cheap price no bad ones found
Style: 5mm Constant Light Color: [17] Red&green (Common Cathode) / 10...
solid haven't found any bad ones yet
Reviewed in the United States on November 7, 2025 by Amazon Customer

Can't find a product?

Find it on Amazon first, then paste the link below.
Checking for best price...