Ready to go? Add this product to your cart and select a plan during checkout. Payment plans are offered through our trusted finance partners Klarna, PayTomorrow, Affirm, Apple Pay, and PayPal. No-credit-needed leasing options through Acima may also be available at checkout.
Learn more about financing & leasing here.
This item is eligible for return within 30 days of receipt
To qualify for a full refund, items must be returned in their original, unused condition. If an item is returned in a used, damaged, or materially different state, you may be granted a partial refund.
To initiate a return, please visit our Returns Center.
View our full returns policy here.
Style: [A] 3mm Constant Light
Color: [01] 5 Color X 20pcs / 100pcs
Features
Description
Low Energy Consumption And Low Heat. Industrial Standard Size,29mm Long Lead for widely used and convenient for cperation. Soldering Condition (Manual Soldering):Less Than 3 Seconds With 482°F-527°F Soldering Condition (Reflow Soldering):Less Than 5 Seconds With 500°F Storage Conditions: Drying Preservation And Keep Away From Fire Or High Temperature. Get other LED models? Please search "EDGELEC Diodes".
Brand: EDGELEC
Manufacturer: EDGELEC
Part Number: ED_TC_YT03_5S
Product Dimensions: 0.13 x 0.12 x 1.3 inches
Item model number: ED_TC_YT03_5S
Is Discontinued By Manufacturer: No
Assembled Height: 33 millimeters
Assembled Length: 3.2 millimeters
Assembled Width: 3 millimeters
Style: [A] 3mm Constant Light
Color: [01] 5 Color X 20pcs / 100pcs
Shape: 3mm Round Top
Specific Uses: General purpose
Special Features: Instant On
Batteries Included?: No
Batteries Required?: No
Type of Bulb: LED
Date First Available: December 4, 2017