Search  for anything...

100pcs 3mm Green Flicker Flickering LED Diodes Candle Flicking Lights Clear Round Lens 29mm Long Lead DC 3V Light Emitting Diode Lamp Bulb +100pcs Resistors (430ohm for DC 6-12V) Included

  • Based on 1,506 reviews
Condition: New
Checking for the best price...
$9.99 Why this price?
Save $7.99 was $17.98

Buy Now, Pay Later


As low as $2 / mo
  • – 4-month term
  • – No impact on credit to apply
  • – Instant approval decision
  • – Secure and straightforward checkout

Ready to go? Add this product to your cart and select a plan during checkout.

Payment plans are offered through our trusted finance partners Klarna, Affirm, Afterpay, Zip, Apple Pay, and Google Pay. No-credit-needed leasing options through Acima may also be available at checkout.

Learn more about financing & leasing here.

Selected Option

Free shipping on this product

FREE 30-day refund/replacement

To qualify for a full refund, items must be returned in their original, unused condition. If an item is returned in a used, damaged, or materially different state, you may be granted a partial refund.

To initiate a return, please visit our Returns Center.

View our full returns policy here.


Availability: Only 7 left in stock, order soon!
Fulfilled by Amazon

Arrives Sunday, Oct 25
Order within 17 hours and 30 minutes
Available payment plans shown during checkout

Protection Plan Protect Your Purchase
Checking for protection plans...

Style: [E] 3mm Flickering Light


Color: [07] Green / 100pcs


Features

  • Product Overview: 100 pcs LED Diodes + 100 pcs Resistors
  • Product Features: Green Lights Flickering / 3mm Round Clear Lens / 29mm Long Lead
  • Product Parameters: Candle Lights Keep Flickering / DC 3.0V-3.2V (IF=20mA) / 0.06 Watts / 2pin / DIP LEDs
  • Product Parameters: Luminance Brighter Up To +20% / Wavelength 520nm-525nm / 30 Viewing Angle / Single LED Diodes Wight: 0.16g
  • Accessories: 100pcs 430ohm (For DC 6-12V) 1/4 Watt Metal Film Resistors Included / 1% Tolerance

Description

Low Energy Consumption And Low Heat. Industrial Standard Size,29mm Long Lead for widely used and convenient for cperation. Soldering Condition (Manual Soldering):Less Than 3 Seconds With 482°F-527°F Soldering Condition (Reflow Soldering):Less Than 5 Seconds With 500°F Storage Conditions: Drying Preservation And Keep Away From Fire Or High Temperature. Get other LED models? Please search "EDGELEC Diodes".

Brand: EDGELEC


Special Feature: Flicker LED (Candle Flickering Lights)


Specific Uses For Product: General purpose


Voltage: 3 Volts


Unit Count: 100 Count


Brand: ‎EDGELEC


Special Feature: ‎Flicker LED (Candle Flickering Lights)


Specific Uses For Product: ‎General purpose


Voltage: ‎3 Volts


Unit Count: ‎100 Count


Shape: ‎3mm Round Top


Material: ‎Metal


Item Package Quantity: ‎100


Light Source Type: ‎LED


Item Weight: ‎160 Milligrams


Style: ‎[E] 3mm Flickering Light


Manufacturer: ‎EDGELEC


Color: ‎[07] Green / 100pcs


UPC: ‎611355168088


Part Number: ‎ED_YT03_FLK-G


Product Dimensions: ‎0.13 x 0.12 x 1.3 inches


Is Discontinued By Manufacturer: ‎No


Assembled Height: ‎33 millimeters


Assembled Length: ‎3.2 millimeters


Assembled Width: ‎3 millimeters


Included Components: ‎Resistors Incuded (For DC 6-12V)


Special Features: ‎Flicker LED (Candle Flickering Lights)


Batteries Included?: ‎No


Batteries Required?: ‎No


Date First Available: December 4, 2017


Frequently asked questions

If you place your order now, the estimated arrival date for this product is: Sunday, Oct 25

Yes, absolutely! You may return this product for a full refund within 30 days of receiving it.

To initiate a return, please visit our Returns Center.

View our full returns policy here.

  • Klarna Financing
  • Affirm Pay in 4
  • Affirm Financing
  • Afterpay Financing
  • Zip Pay in 4
  • Financing through Apple Pay
  • Financing through Google Pay
Leasing options through Acima may also be available during checkout.

Learn more about financing & leasing here.

Top Amazon Reviews


  • Good LED lights, sturdy and reliable
Style: [E] 3mm Flickering Light Color: [06] Yellow / 100pcs
The media could not be loaded. This is my review of Edgelec’s Flickering LED Lights The company sells these LED lights in several different colors, and you can get them in solid or flickering modes. You get 100 lights (I counted them), and an equal number of resistors. The resistors allow you to use the lights at different voltages. A sampling of 10 lights, showed that they all performed perfectly. They were tested using a 3v (series) battery pack, so I did not require the use of a resistor. They are perfect for miniature modeling, lighting up a scale railroad landscape, making faux flickering candles, or placing them into a bookshelf diorama. I am using these flicker (yellow) lights to create a realistic flame effect in a small diorama. The wires are sturdy and even though I had to bend the wires, they held together without problem Check out my included video to see them in action. ... show more
Reviewed in the United States on April 7, 2024 by Snowball Snowball

  • Great if you're willing to do a little work
Style: [F] 5mm Flickering Light Color: [06] Yellow / 100pcs
I've got these wired up as a test currently using an old 5v phone charger through the included resistor. Everything is working as expected. The color is great, the flickering is subtle but noticeable - just what I was hoping. This is a solid value for the price. You'd spend easily five times the amount for pre-built, so I'm happy to save some money where I'm able to. My plan is to install these in some homemade halloween candles made from PVC/hot glue and power them via a small transformer and buck converter rather than batteries. The above test gives me the confidence to move forward in the design, but I'll update later once I have more completed in case anyone wants more details. ... show more
Reviewed in the United States on August 15, 2023 by Sarandi

  • Great led diodes
Style: [B] 5mm Constant Light Color: [02] 10 Colors X 20 Pcs / 200pcs
I used these led diodes to upgrade the MIL lights on a 1995 GM cluster. The cluster panel already has voltage regulator built-in so I did not need the included resistors. So far so good. Much brighter than the original halogen bulbs. I will update this post if any of the led diodes crap out.
Reviewed in the United States on July 17, 2025 by Josh

  • Most of them work
Style: [F] 5mm Flickering Light Color: [06] Yellow / 100pcs
So far 2 didn't work right away & 2 quit working after few hours but I've used up half of them & rest working good with maybe 20hrs on them. Price was cheap & I'd expect a few bad ones. If they start dying out on me I'll change review & let you know. Being built into a wall so hope they stay good .be really hard to change them out. I think really nice price & product I'll keep you up dated ... show more
Reviewed in the United States on January 23, 2026 by Go faster

  • candle affects
Style: [E] 3mm Flickering Light Color: [06] Yellow / 100pcs
I love these lights great for candle affects in modeling.
Reviewed in the United States on December 10, 2025 by ODubhain

  • Great Price, product works as advertised
Style: [E] 3mm Flickering Light Color: [06] Yellow / 100pcs
I’m happy with the yellow flickering “candle light style” LED diodes that I ordered. They arrived quickly and were a great price. If I have any criticism, the leads are a little close in length. The negative lead is definitely shorter than the positive, as it should be, but the difference could be greater to make them more immediately identifiable. This is of course a very tiny point (you can always trim the negative yourself if you need it shorter) so I didn’t let it affect my star rating. ... show more
Reviewed in the United States on November 13, 2023 by Kindle Customer

  • Found resistors. Good order.
Style: [F] 5mm Flickering Light Color: [06] Yellow / 100pcs
Found resistors in bottom of box.
Reviewed in the United States on September 27, 2025 by Grady Branham

  • Great for starship models!
Style: [E] 3mm Flickering Light Color: [05] Red / 100pcs
The media could not be loaded. Decided to use these for a flickering effect on a Star Trek model that I was adding lights to. I was able to configure 3 of these to get the effect I was looking for. I didn't really need 100 total, but for the price, I'm not going to complain. These work extremely well! ... show more
Reviewed in the United States on December 22, 2023 by Chris B.

Can't find a product?

Find it on Amazon first, then paste the link below.
Checking for best price...