Search  for anything...

100pcs 5mm Red Lights LED Diodes Clear Round Lens 29mm Long Lead (DC 2V) +100pcs Resistors (for DC 6-12V) Included, Bright Bulb Lamps Light Emitting Diode

  • Based on 21 reviews
Condition: New
Checking for the best price...

Buy Now, Pay Later


As low as $1 / mo
  • – 4-month term
  • – No impact on credit to apply
  • – Instant approval decision
  • – Secure and straightforward checkout

Ready to go? Add this product to your cart and select a plan during checkout.

Payment plans are offered through our trusted finance partners Klarna, Affirm, Afterpay, Zip, Apple Pay, and Google Pay. No-credit-needed leasing options through Acima may also be available at checkout.

Learn more about financing & leasing here.

Selected Option

Free shipping on this product

FREE 30-day refund/replacement

To qualify for a full refund, items must be returned in their original, unused condition. If an item is returned in a used, damaged, or materially different state, you may be granted a partial refund.

To initiate a return, please visit our Returns Center.

View our full returns policy here.


Availability: 20 left in stock
Fulfilled by Amazon

Arrives Friday, Oct 23
Order within 17 hours and 7 minutes
Available payment plans shown during checkout

Protection Plan Protect Your Purchase
Checking for protection plans...

Style: [B] 5mm Constant Light


Color: [05] Red / 100pcs


Features

  • Product Overview: 100 pcs LED Diodes + 100 pcs Resistors
  • Product Features: Red - 5mm Round Clear Lens
  • Product Parameters: 29mm Long Lead / DC 2.0V-2.2V (IF=20mA) / 0.06 Watts / 2pin / DIP LEDs
  • Product Parameters: Luminance Brighter Up To +20% / Wavelength 620nm-625nm / 30 Viewing Angle / Single LED Diodes Wight: 0.29g
  • Accessories: 100pcs 470ohm (For DC 6-12V) 1/4 Watt Metal Film Resistors Included / 1% Tolerance

Description

Low Energy Consumption And Low Heat. Industrial Standard Size,29mm Long Lead for widely used and convenient for cperation. Soldering Condition (Manual Soldering):Less Than 3 Seconds With 482°F-527°F Soldering Condition (Reflow Soldering):Less Than 5 Seconds With 500°F Storage Conditions: Drying Preservation And Keep Away From Fire Or High Temperature. Get other LED models? Please search "EDGELEC Diodes".

Brand: EDGELEC


Light Type: LED


Special Feature: Instant On


Specific Uses For Product: General purpose


Light Color: red


Light Type: LED


Additional Features: Instant On


Specific Uses For Product: General purpose


Light Color: red


Voltage: 2 volts


Power Consumption: 0.06 watts


Light Source Type: LED


Light Source Wattage: 0.06 watts


Unit Count: 100 Count


Package Quantity: 100


Item Weight: 290 milligrams


Brand Name: EDGELEC


Model Number: ED_YT05_R


Manufacturer: EDGELEC


UPC: 611355168149


Manufacturer Part Number: ED_YT05_R


Material Type: Polycarbonate (PC)


Shape: 5mm Round Top


Style Name: [B] 5mm Constant Light


Color: [05] Red / 100pcs


Frequently asked questions

If you place your order now, the estimated arrival date for this product is: Friday, Oct 23

Yes, absolutely! You may return this product for a full refund within 30 days of receiving it.

To initiate a return, please visit our Returns Center.

View our full returns policy here.

  • Klarna Financing
  • Affirm Pay in 4
  • Affirm Financing
  • Afterpay Financing
  • Zip Pay in 4
  • Financing through Apple Pay
  • Financing through Google Pay
Leasing options through Acima may also be available during checkout.

Learn more about financing & leasing here.

Top Amazon Reviews


  • LEDs are fine, resistors ratings are misleading
Style: [A] 3mm Constant Light Color: [02] 10 Colors X 20 Pcs / 200pcs
The LEDs are perfectly fine so far although I have only been testing to see if they work. While the resistors are a nice bonus and not what I ordered this for, the tolerances are off. Going by the markings these are 1% tolerance (brown band), but the 430ohm resistors were reading closer to 400ohm. Looking closely at the tolerance marking shows a bit of silver paint on some of them leading me to believe these were manufactured as 10% tolerance (silver band) and repainted to appear as 1% tolerance. Not the end of the world if using for LEDs in low power applications, but if storing with other 1% tolerance resistors maybe keep these separate. The 470ohm reads closer to 440ohm for me so be sure to verify resistances and do calculations. Overall I am happy with the LEDs but a bit disappointed the resistors are misrepresented. ... show more
Reviewed in the United States 🇺🇸 on September 19, 2022 by Brett Fisher

  • LED is absolutely crystal clear
Style: [B] 5mm Constant Light Color: [03] White / 100pcs
Used the product to repair a sight illuminator for a hunting bow. Voltage drop across the junction is 2.8v. Illuminator uses 2 LR44, 1.5v batteries to power the LED.
Reviewed in the United States 🇺🇸 on November 7, 2022 by Robert A., Philadelphia, PA

  • Nice RGB LED
Style: [B] 5mm Constant Light Color: [22] Rgb Tri-color (Common Cathode) / 10...
These RGB LEDs come with a set of 430-ohm, 1% and 470-ohm, 1% resistors to match the different voltage/current requirements of the red, green and blue colors. Very nice LEDs.
Reviewed in the United States 🇺🇸 on September 11, 2022 by JimH

  • Flickering red/yellow work as expected
Style: [F] 5mm Flickering Light Color: [05] Red / 100pcs
Running these with the provided 470 ohm resistor causes the resistor to heat up quite a bit, so I am running them at 5v. Three in a cluster (two yellow, one red) draws about 14 mA I chose a mixture of colors rather than a single LED to make things seem more like a larger candle, but they work equally well with just one. ... show more
Reviewed in the United States 🇺🇸 on August 9, 2022 by The Graffs

  • Not good for “black light” effect - you want 365nm
Style: [B] 5mm Constant Light Color: [11] Purple (Uv) / 100pcs
I got these hoping for some cool black light effects. They are fine LEDs, I just did not pay close attention when I got them. If you are looking for a more “ghostly white purple” these are for you. They do activate fluorescents, and glow in the dark pigments, but not as well as would be hoped. Because they are closer to invisible light (UV), they do not impress much when on, (at 2.85 volts). The reality is, they are working, but you can’t see them well. I have been driving some at 4volts DC, (without the resistor) and they are a bit more impressive. I may be overdriving them, and it may shorten their lifespan, but they seem to be doing okay, and I am really not happy I got these. The leds in the skull photo are on a DC power supply, metered at 2.85 volts. I hope that helps any fellow Halloweeners! ... show more
Reviewed in the United States 🇺🇸 on October 3, 2021 by Dirk Lonestar

  • works well, thanks for the resistors
Style: [E] 3mm Flickering Light Color: [05] Red / 100pcs
Using 5v input and the included resistor. Would like to see a little more brightness but it's decent. Gives a nice variable glow like fire. Bought red and yellow to mix together.
Reviewed in the United States 🇺🇸 on February 26, 2022 by J. Zenkus

  • Great brightness, terrible color blending, red gets overpowered by other colors
Style: [B] 5mm Constant Light Color: [22] Rgb Tri-color (Common Cathode) / 10...
Resister tolerance is 2%, not 1% as advertised. Resistor leads are very thin and don't work well in a breadboard without bending them in half. The colors do not blend very well. Blue is overpowering when on. Holding my hand above the LED I can see 3 distinct circles and the only place the colors blend even a little is at the edge of these circles. If you're looking for true RGB LEDs, these aren't it. And now the good. They are super bright. I have spots in front of my eyes from testing one. The provided resistors are for a 12V circuit and they work pretty well even down to 3.5V. They'll definitely be useful for something, just not the project I had in mind. And at about 9 cents apiece including 3 resistors with each one I'm not complaining about the price. ... show more
Reviewed in the United States 🇺🇸 on April 15, 2021 by KC

  • Great Deal!
Style: [B] 5mm Constant Light Color: [11] Purple (Uv) / 100pcs
I remember buying 2 uv LED for $5 @ radioshack when they still existed around here, so you aren't going to get a complaint from me about these, but i digress. didn't count them cuz there was a freaking lot of them, didn't doubt it was 100 pc, but even if it were 20 short still not complaining, i was just trying to get a couple for a couple buck anyway. -the leads really are longer, i was slightly impressed to see truth to that (mind you they are thinner than some, not complaining) -they are actually UV, made a pack of highlighter look like some wild glowsticks -100resistors?!?! i was going to buy the LEDs any way, but this got me to buy from them as opposed to other sellers -packed well enough for LEDs, anti-stack pouches, labeled 3.3v UV and .25 watt, 430ohm respectively (otherwise i'll throw them in a bead bag from the crafts aisle, forget what they are and have to test them or look them up) thoroughly satisfied with this purchase, don't think i'll need more for a long time, but i'll happily order another color from this seller ... show more
Reviewed in the United States 🇺🇸 on August 8, 2019 by Nadean Gutierrez

Can't find a product?

Find it on Amazon first, then paste the link below.
Checking for best price...