Search  for anything...

Winterize RV, Motorhome, Boat, Camper, and Travel Trailer: Air Compressor Quick-Connect Plug to Male Garden Hose Faucet Blow Out Adapter with Valve, 14" Long, Lead-Free

  • Based on 917 reviews
Condition: New
Checking for the best price...
$12.99 Why this price?
Save $5.99 was $18.98

Buy Now, Pay Later


As low as $3 / mo
  • – 4-month term
  • – No impact on credit to apply
  • – Instant approval decision
  • – Secure and straightforward checkout

Ready to go? Add this product to your cart and select a plan during checkout.

Payment plans are offered through our trusted finance partners Klarna, Affirm, Afterpay, Zip, Apple Pay, and Google Pay. No-credit-needed leasing options through Acima may also be available at checkout.

Learn more about financing & leasing here.

Selected Option

Free shipping on this product

Returnable until Jan 31, 2025

To qualify for a full refund, items must be returned in their original, unused condition. If an item is returned in a used, damaged, or materially different state, you may be granted a partial refund.

To initiate a return, please visit our Returns Center.

View our full returns policy here.


Availability: In Stock.
Fulfilled by Amazon

Arrives Monday, Aug 10
Order within 12 hours and 27 minutes
Available payment plans shown during checkout

Protection Plan Protect Your Purchase
Checking for protection plans...

Size: 14" Lead-Free


Features

  • Blowout adapter with shut-off valve to winterize your recreational vehicles (RV), motorhome, camper, boat, watercraft, and travel trailer by blow out method. This is a safer, healthier, and environmentally friendlier winterization tool when compared with those winterizing kits that use antifreeze.
  • Its 3/4"-11 NH hose threads easily connects to a standard garden hose. Its 1/4" Industrial Interchange Quick-connect plug is the most common quick-connect fitting for air compressors in North America. This new design which incorporates fewer joints to reduce the chance of leaks.
  • The flexible and kink-free Insta-Grip hose (made in USA) allows the adapter to access tight spaces and minimizes stress on pipes and fittings. Pre-assembled length: 14 inches approx. Pressure rating: 250 psi. It is 100% outdoor rated, virtually indestructible, impervious to water and oil.
  • For your health and safety, the fittings are made of lead-free brass, certified to contain less than 0.25% lead. Always wear safety goggles when handling or using compressed air.
  • This winterization tool is made from the highest quality parts. The shut-off valve is made from forged brass (not brass casting) for extra strength and durability. If you are looking for a heavy duty tool that lasts a lifetime, this one is for you! This blowout adaptor may also be used to winterize sprinkler system, drip irrigation system, soaker hose, spigot, faucet, sillcock, water garden hose and hose bibb where applicable. Assembled in Wichita, Kansas, USA with domestic and foreign parts.

Description

A quick and easy way to blow out the water lines of your RV, motorhome, camper, boat, and travel trailer. Winterizing is easy with this blow out adapter. One end of the adapter has a male garden hose faucet/spigot/spout connection which screws directly to the city water inlet on your RV, motorhome, boat or travel trailer. The other end of the adapter has a quick- connect plug designed to connect to most air compressors. If your compressor does not have quick-connect coupler, you can easily remove the quick-connect plug with a wrench to get access to the 1/4" male NPT (national pipe thread) connection, which is a very common connection. Your local hardware store should be able to help you find the proper adapter to connect the 1/4" male NPT to your air compressor. The flexible hose allows the adapter to access tight spaces and minimizes stress on your piping and fittings. We use food- grade vegetable oil and non-toxic plumber's pipe dope only in the installation process. Most commercially available brass fittings contain up to 8% lead, but for your health and safety, the lead-free brass fittings in this item have been tested by an independent testing lab and certified to contain less than 0.25% lead.

Size: 14" Lead-Free


Material: Brass


Brand: Vibrant Yard Co. LLC


Color: Silver


Item dimensions L x W x H: 14 x 1.1 x 1.1 inches


Connector Type: Quick-connect fitting


Thread Size: 3/4-11 NH


Exterior Finish: Brass


Thread Type: NH


Item Weight: 0.21 Kilograms


Size: ‎14" Lead-Free


Material: ‎Brass


Brand: ‎Vibrant Yard Co. LLC


Color: ‎Silver


Item dimensions L x W x H: ‎14 x 1.1 x 1.1 inches


Connector Type: ‎Quick-connect fitting


Thread Size: ‎3/4-11 NH


Exterior Finish: ‎Brass


Thread Type: ‎NH


Item Weight: ‎0.21 Kilograms


Number of Pieces: ‎1


Manufacturer: ‎Vibrant Yard Company LLC


UPC: ‎703929688921


Item Weight: ‎7.4 ounces


Product Dimensions: ‎14 x 1.1 x 1.1 inches


Country of Origin: ‎USA


Item model number: ‎MV14


Manufacturer Part Number: ‎MV14


Date First Available: January 8, 2020


Frequently asked questions

If you place your order now, the estimated arrival date for this product is: Monday, Aug 10

Yes, absolutely! You may return this product for a full refund within 30 days of receiving it.

To initiate a return, please visit our Returns Center.

View our full returns policy here.

  • Klarna Financing
  • Affirm Pay in 4
  • Affirm Financing
  • Afterpay Financing
  • Zip Pay in 4
  • Financing through Apple Pay
  • Financing through Google Pay
Leasing options through Acima may also be available during checkout.

Learn more about financing & leasing here.

Top Amazon Reviews


  • Well made in the USA
Size: 14" Lead-Free
Perfect for winterizing and you've got made in the USA quality. Worked as advertised.
Reviewed in the United States on October 30, 2024 by Joe L

  • Worked fine and appears good quality
Size: 10.5" Lead-Free
Blew out the lines on Grand Design fifth wheel for winterizing. Both ends fit snug,
Reviewed in the United States on November 24, 2024 by JimInAlabama

  • Worked great
Size: 14" Lead-Free
I used this to blow out the water lines in my RV with my air compressor. Both male and female ends fit perfectly into the compressor and water intake with no leaks.
Reviewed in the United States on November 29, 2024 by Mark L Kinnee

  • Works well
Size: 13 Inches
I am pleased with the product, quality, and function. Would have been super pleased if it was 5.99. Overall, did the job and I appreciated having the shut off valve.
Reviewed in the United States on November 22, 2024 by Brandi

  • The product worked perfectly
Size: 10.5" Lead-Free
This product worked perfectly for winterizing my camper.
Reviewed in the United States on December 5, 2024 by John Armstrong

  • good product
Size: 10.5" Lead-Free
Works as advertised. Made winterizing our camper a breeze. Just make sure to turn down air pressure.
Reviewed in the United States on August 17, 2024 by Robert F.

  • Quality
Size: 14" Lead-Free
I chose this because of the length for flexibility. I've used it twice, attached to an RV. The quality is great, and I'd recommend.
Reviewed in the United States on November 25, 2024 by K in CO

  • Winterize RV
Size: 13 Inches
I got this to help winterize my RV, I don't like to run antifreeze in the lines so I use an air compressor to blow out the lines. The part is good quality and I recommend to anyone needing to winterize their RV by blowing out the lines.
Reviewed in the United States on December 18, 2024 by Jorge A Rivera

Can't find a product?

Find it on Amazon first, then paste the link below.
Checking for best price...