Search  for anything...

100pcs 5mm RGB Tri-Color (Red Green Blue Multicolor) 4Pin LED Diodes Common Cathode Clear Round Lens 29mm Long Lead +300pcs Resistors (for DC 6-12V) Included,Light Emitting Diodes

  • Based on 2,166 reviews
Condition: New
Checking for the best price...

Buy Now, Pay Later


As low as $2 / mo
  • – 4-month term
  • – No impact on credit to apply
  • – Instant approval decision
  • – Secure and straightforward checkout

Ready to go? Add this product to your cart and select a plan during checkout.

Payment plans are offered through our trusted finance partners Klarna, Affirm, Afterpay, Zip, Apple Pay, and Google Pay. No-credit-needed leasing options through Acima may also be available at checkout.

Learn more about financing & leasing here.

Selected Option

Free shipping on this product

30-day refund/replacement

To qualify for a full refund, items must be returned in their original, unused condition. If an item is returned in a used, damaged, or materially different state, you may be granted a partial refund.

To initiate a return, please visit our Returns Center.

View our full returns policy here.


Availability: Only 10 left in stock, order soon!
Fulfilled by Amazon

Arrives Wednesday, Sep 16
Order within 21 hours and 31 minutes
Available payment plans shown during checkout

Protection Plan Protect Your Purchase
Checking for protection plans...

Style: [B] 5mm Constant Light


Color: [22] Rgb Tri-color (Common Cathode) / 100pcs


Features

  • Product Overview: 100 pcs LED Diodes + 300 pcs Resistors
  • Product Features: Tri-Color (Red/Green/Blue) Lights / Common Cathode / 5mm Clear Round Lens
  • Product Parameters: 29mm Long Lead / Red: DC 2.0 - 2.2V; Blue&Green: DC 3.0 - 3.2V (IF=20mA) / 0.06 Watts / 2pin / DIP LEDs
  • Product Parameters: Luminance Brighter Up To +20% / 30 Viewing Angle / Single LED Diodes Wight: 0.38g
  • Accessories: 200pcs 430ohm + 100pcs 470ohm (For DC 6-12V) 1/4 Watt Metal Film Resistors Included / 1% Tolerance

Description

Low Energy Consumption And Low Heat. Industrial Standard Size,29mm Long Lead for widely used and convenient for cperation. Soldering Condition (Manual Soldering):Less Than 3 Seconds With 482°F-527°F Soldering Condition (Reflow Soldering):Less Than 5 Seconds With 500°F Storage Conditions: Drying Preservation And Keep Away From Fire Or High Temperature. Get other LED models? Please search "EDGELEC Diodes".

Brand: EDGELEC


Light Type: LED


Special Feature: Instant On


Bulb Shape Size: B10


Bulb Base: E26


Is Discontinued By Manufacturer ‏ : ‎ No


Product Dimensions ‏ : ‎ 0.21 x 0.2 x 1.4 inches; 0.01 ounces


Item model number ‏ : ‎ ED_YT05_RGB-4P-C


Date First Available ‏ : ‎ December 4, 2017


Manufacturer ‏ : ‎ EDGELEC


Customer Reviews: 4.7 4.7 out of 5 stars 2,166 ratings


Brand: ‎EDGELEC


Light Type: ‎LED


Special Feature: ‎Instant On


Bulb Shape Size: ‎B10


Bulb Base: ‎E26


Specific Uses For Product: ‎General purpose


Light Color: ‎Red, Green


Voltage: ‎3 Volts


Unit Count: ‎100 Count


Number of Items: ‎100


Shape: ‎5mm Round Top


Material: ‎Metal


Connectivity Technology: ‎Normal bulb


Controller Type: ‎Push Button


Included Components: ‎100 pcs LED Diodes, 300 pcs Resistors, 200pcs 430ohm Resistors, 100pcs 470ohm Resistors


Beam Angle: ‎30 Degrees


Item Package Quantity: ‎100


Light Source Type: ‎LED


Item Weight: ‎380 Milligrams


Light Source Wattage: ‎0.06 Watts


Control Method: ‎Touch


Manufacturer: ‎EDGELEC


UPC: ‎611355168316


Part Number: ‎ED_YT05_RGB-4P-C


Product Dimensions: ‎0.21 x 0.2 x 1.4 inches


Item model number: ‎ED_YT05_RGB-4P-C


Is Discontinued By Manufacturer: ‎No


Assembled Height: ‎35.5 millimeters


Assembled Length: ‎5.3 millimeters


Assembled Width: ‎5 millimeters


Style: ‎[B] 5mm Constant Light


Color: ‎[22] Rgb Tri-color (Common Cathode) / 100pcs


Finish types: ‎Clear


Special Features: ‎Instant On


Batteries Included?: ‎No


Batteries Required?: ‎No


Wattage: ‎0.06 Watts


Date First Available: December 4, 2017


Frequently asked questions

If you place your order now, the estimated arrival date for this product is: Wednesday, Sep 16

Yes, absolutely! You may return this product for a full refund within 30 days of receiving it.

To initiate a return, please visit our Returns Center.

View our full returns policy here.

  • Klarna Financing
  • Affirm Pay in 4
  • Affirm Financing
  • Afterpay Financing
  • Zip Pay in 4
  • Financing through Apple Pay
  • Financing through Google Pay
Leasing options through Acima may also be available during checkout.

Learn more about financing & leasing here.

Top Amazon Reviews


  • Good LED lights, sturdy and reliable
Style: [E] 3mm Flickering Light Color: [06] Yellow / 100pcs
The media could not be loaded. This is my review of Edgelec’s Flickering LED Lights The company sells these LED lights in several different colors, and you can get them in solid or flickering modes. You get 100 lights (I counted them), and an equal number of resistors. The resistors allow you to use the lights at different voltages. A sampling of 10 lights, showed that they all performed perfectly. They were tested using a 3v (series) battery pack, so I did not require the use of a resistor. They are perfect for miniature modeling, lighting up a scale railroad landscape, making faux flickering candles, or placing them into a bookshelf diorama. I am using these flicker (yellow) lights to create a realistic flame effect in a small diorama. The wires are sturdy and even though I had to bend the wires, they held together without problem Check out my included video to see them in action. ... show more
Reviewed in the United States on April 7, 2024 by Snowball Snowball

  • Work perfectly
Style: [A] 3mm Constant Light Color: [17] Red&blue (Common Anode) / 100pcs
I used these to replace the "charging", "fully charged" LED indicator on a bottled-water pump. A drop in replacement that worked perfectly.
Reviewed in the United States on November 7, 2024 by F Volker

  • Good fluorescence
Style: [A] 3mm Constant Light Color: [11] Purple (Uv) / 100pcs
All the bulbs I've used work and they make bright colors fluoresce
Reviewed in the United States on October 11, 2024 by A. Person

  • Would Give 5 Stars If Leads Were Better
Style: [B] 5mm Constant Light Color: [09] Blue / 100pcs
Very good LED for price and quantity. This might be arbitrary to some, but the leads on these are a little weak to not break but will bend easily as you try to solder them. I normally run the leads through the circuit board then bend them to hold the bulb in place. When I would flip the board over to solder, even with a careful touch mind you, the soldering iron tip would start to re-bend the lead due to the contact pressure and the bulb would fall through the hole a little causing it to solder at an angle. I know this is not a big deal. I am just a stickler to have a clean and straight soldered board on my projects. ... show more
Reviewed in the United States on February 7, 2021 by Skinny

  • Great for modeling fire
Style: [E] 3mm Flickering Light Color: [05] Red / 100pcs
Good product. Flickering is realistic. I used as a firebox light in a model train. Pleanty brightness. Model train controller (DCC) supplies about 14v DC so I used a larger resistor value. I could have used 3 of the supplied resistors in series. When the current is too low light is dimmer, but no flicker. About 15mA-20mA flickers nicely. ... show more
Reviewed in the United States on February 3, 2024 by Graham

  • Bright RGB LEDs
Style: [B] 5mm Constant Light Color: [19] Rgb Fast Flashing / 100pcs
These are really nice n bright. Show the 3 colors great.
Reviewed in the United States on June 18, 2024 by Gang

  • Great if you're willing to do a little work
Style: [F] 5mm Flickering Light Color: [06] Yellow / 100pcs
I've got these wired up as a test currently using an old 5v phone charger through the included resistor. Everything is working as expected. The color is great, the flickering is subtle but noticeable - just what I was hoping. This is a solid value for the price. You'd spend easily five times the amount for pre-built, so I'm happy to save some money where I'm able to. My plan is to install these in some homemade halloween candles made from PVC/hot glue and power them via a small transformer and buck converter rather than batteries. The above test gives me the confidence to move forward in the design, but I'll update later once I have more completed in case anyone wants more details. ... show more
Reviewed in the United States on August 15, 2023 by Sarandi

  • Great for model railroad turnout indicator
Style: [A] 3mm Constant Light Color: [14] Red&green (Common Cathode) / 10...
Adds a degree of professionalism to control panel.
Reviewed in the United States on December 24, 2024 by Robert D.

Can't find a product?

Find it on Amazon first, then paste the link below.
Checking for best price...