Search  for anything...

100pcs 5mm White Lights LED Diodes Flat Lens 29mm Long Lead (DC 3V) +100pcs Resistors (for DC 6-12V) Included, Bright Bulb Lamps Light Emitting Diode

Based on 360 reviews
Condition: New
Checking for the best price...
$6.99
Save $109.00 was $115.99

Buy Now, Pay Later


As low as $1 / mo
  • – 4-month term
  • – No impact on credit to apply
  • – Instant approval decision
  • – Secure and straightforward checkout

Ready to go? Add this product to your cart and select a plan during checkout.

Payment plans are offered through our trusted finance partners Klarna, Affirm, Afterpay, Zip, Apple Pay, and Google Pay. No-credit-needed leasing options through Acima may also be available at checkout.

Learn more about financing & leasing here.

Selected Option

Free shipping on this product

FREE refund/replacement until Jan 31, 2026

To qualify for a full refund, items must be returned in their original, unused condition. If an item is returned in a used, damaged, or materially different state, you may be granted a partial refund.

To initiate a return, please visit our Returns Center.

View our full returns policy here.


Availability: Only 6 left in stock, order soon!
Fulfilled by Amazon

Arrives Nov 2 – Nov 3
Order within 9 hours and 6 minutes

Available payment plans shown during checkout

Protect Your Purchase

Easy claims online, fast replacements, no fees

Checking for protection plans...

At a glance

Condition
New
Color
[03] White / 100pcs
Size
5mm Flat Top
Model
ED_P05_W_100Pcs
Dimensions
0.21 x 0.2 x 1.36 in; 0.01 oz
Weight
240 Milligrams
Material
Polycarbonate

Features 5

  • Product Overview: 100 pcs LED Diodes + 100 pcs Resistors
  • Product Features: White Lights / 5mm Flat Clear Lens Lens
  • Product Parameters: 29mm Long Lead / DC 3.0V-3.2V (IF=20mA) / 0.06 Watts / 2pin / DIP LEDs
  • Product Parameters: Luminance Brighter Up To +20% / Wavelength 6000K-9000K / 60 Viewing Angle / Single LED Diodes Wight: 0.24g

Description

Low Energy Consumption And Low Heat. Industrial Standard Size,29mm Long Lead for widely used and convenient for cperation. Soldering Condition (Manual Soldering):Less Than 3 Seconds With 482°F-527°F Soldering Condition (Reflow Soldering):Less Than 5 Seconds With 500°F Storage Conditions: Drying Preservation And Keep Away From Fire Or High Temperature. Get other LED models? Please search "EDGELEC Diodes".

Specs 32

Color [03] White / 100pcs
Brand EDGELEC
Indoor/Outdoor Usage Indoor
Special Feature Instant On
Light Source Type LED
Power Source DC Power Supply
Light Color White
Theme Christmas

Frequently asked questions

If you place your order now, the estimated arrival date for this product is: Nov 2 – Nov 3

Yes, absolutely! You may return this product for a full refund within 30 days of receiving it.

To initiate a return, please visit our Returns Center.

View our full returns policy here.

  • Klarna Financing
  • Affirm Pay in 4
  • Affirm Financing
  • Afterpay Financing
  • Zip Pay in 4
  • Financing through Apple Pay
  • Financing through Google Pay
Leasing options through Acima may also be available during checkout.

Learn more about financing & leasing here.

Top Amazon Reviews


Nice little color changing LEDs.
Color: [15] Rgb Slow Flashing / 100pcs Size: 3mm Flat Top
These are nice, bright, inexpensive color changing LEDs. I've used mine to make USB powered, rectangular grid decorative lights, and they work quite splendidly. A note for other potential buyers though: cheap color changing LEDs like this WILL NOT remain synchronized for more than one or two cycles. If you need color changing LEDs to synchronize, you have to get ones designed specifically for that feature (if they exist), or get RGB LEDs and control them using a micro-controller or some other similar method. ... show more
Reviewed in the United States on March 30, 2021 by D. Lefebvre

Nice and bright.
Color: [07] Green / 100pcs Size: 3mm Flat Top
Great color and bright light emission.
Reviewed in the United States on December 16, 2024 by Kevin C.

3 volt LEDs
Color: [02] 9 Colors x 20 pcs / 180pcs Size: 5mm Flat Top
I find that these LEDs work very well , the colors are good. The warm white is very nice. Can recommend these. Thanks
Reviewed in the United States on October 4, 2025 by Mike

I have tested these LEDs and I am pleased
Color: [04] Warm White / 100pcs Size: 5mm Flat Top
I put one of these diodes on a lab power supply set at 3 volts for six hours. At that voltage, it consumes 14ma of current and is VERY bright. After six hours there are no problems, the current is dead on steady, and it is just warm, not hot. I conclude 3 volts is a good setting for this LED. The calculation for finding the current limiting resistor desired ( a resistor in series with the LED) for this 3 volt LED at 14ma is simple,( using a battery also in series). Here are examples: R =(Battery voltage - LED voltage )/ Led Current in amps For a 6 volt battery: R = 6-3/0.14 = 214 ohms For a 12 volt battery: R = 12-3/0.14 = 642 ohms Note that resistors do not come in every value, so choose the next larger one. For a 1% tolerance resistor, use 215 ohms and 649 for the above. For a 5% tolerance resistor, use 220 ohm and 680 ohm. The enclosed 430 volt resistors works well with a 10 volt power supply. Five bucks for a hundred (5c each) seems like a bargain. ... show more
Reviewed in the United States on February 5, 2021 by ILuvAmazon

easy to use
i sued them to make spiderman invitaions for my sons birthday party and they were east so use. i used them with copper tape.
Reviewed in the United States on June 30, 2023 by vanessavhk

Make good bug lights with fly paper
Color: [12] Purple (Uv) / 100pcs Size: 5mm Flat Top
They work great using two AA batteries
Reviewed in the United States on August 19, 2025 by Amazon Customer

Nice Very warm white color. Not that cold white color
Color: [04] Warm White / 100pcs Size: 5mm Flat Top
Very warm. Almost yellow. Just What I wanted
Reviewed in the United States on October 16, 2025 by horses IT guy

Resistors are too large
Color: [08] Blue / 100pcs Size: 5mm Flat Top
LED themselves are bright; they are clear initially but produce the blue light when the power applied. But the resistors included with the diodes are too large. I am talking about the nominal, it is about the dimensions. It is impossible to fit the diode with soldered resistor inside of a standard Christmas light casing. I could only reuse the old resistor from burnt diode, whenever it was possible. That made the resistor part of a package useless for me. ... show more
Reviewed in the United States on December 26, 2022 by Humble Handyman
Checking for best price...